
Add to Cart
HD600Automatic cement bag Bottom Machine
INTRODUCTION:
it’s consisted of tube , printing and Bottom machine
The tube is multi-layer tube machine, the same as in the semi-automatic.
Process description
HD600 Bottomer Machine
High-speed Feeding & Auot-Arranging
Perforating & Forming Bottom Line on the Tube
Tube Transporting
Bottom Opening
Valve Scrip Pasting
controlled by electrical system.
Bottom Pasting
●This unit glues the bottoms evenly under the control of PLC.
●If the bottom is not fully opened, the unit will avoid gluing these bags.
●For a smooth bottom pasting, this mechanism will press two bottom traces by two sets of wheels.
Bottom Sealing & Bottom Reversing
Bag Counting and Delivering
The whole machine is under PLC and photoelectricity & air control. Siemens electrical system and high precise mechanical parts are equipped to ensure excellent performance and long working life.
Servo system is available for option.
Bag samples
Technical parameter
HD600BottomerMachine
Operating condition
Working hour : 24hours/day
Design temperature : 0~40℃
Design humidity : MAX. 95%
Number required : 1 unit
Model name : HD600
Performance
Speed :110-120 bags/min
(Depends on paper quality, number of plyandoperators’ skill.)
Paper center distance : 420 ~ 700mm
Length of bag tube : 420~700mm
Width of bag : 510~830mm
Paste bottom width : 90 mm ~ 130mm
At the end of a width : 240 ~ 520mm
Mouth-valve disc : 170 (208, 240)
Orifice disk Width : 100 ~ 190mm
Total power : 28.5KW
Unit Weight : 20T
Overall appearance Dimensions : 22 (L) * 2.5 (W) * 2 (H) m
Composing of the production line
HD600BottomerMachine
Name Quantity
Rotary feeding: 1
Trimming & Perfortion scoring : 1
Bottom opening: 1
Reinforcement of note: 1
Cylinder - shaped mouth valve device: 1
Bottom forming: 1
Turning up of the sack bottom: 1
Delivery section: 1
Pile up: 1
Platform for storing : 1
Electric control system: 1
Vacuum pump: 1
Remark: This Bottomer is able to produce scrip to meet requirements of 3 bag production lines.
Bottomer machine
Technical support & service
Installation, commissioning & training:
For installation, our company will send working team to install the machine.
1) We dispatch working team to supervise installation and commissioning. The buyer’s skillful technical persons, labor force, auxiliary equipment, necessary tools and materials should be available for the installation and commissioning.
2) We provide training during and after the commissioning at the buyer’s site.
3) We also provide training at the seller’s site.
4) Generally the installation and commissioning will be completed in 30 days.
5) The buyer is in charge of the cost of transportation and accommodation of our working team and pay 80 USD/day for each person.
Warranty:
12 months from the acceptance at the buyer’s site. Hardware will be replaced for free during warranty period excluding the damages under mistaken operation and maintenance.
Spare parts:
Plant construction:
We will provide full solution for the buyer’s plant construction according to the buyer’s requirements.
The whole production line will be tested at the seller’s site, and only can be delivered after successful commissioning and accepted by the buyer.